Progress of Works on the Stara Drava Varaždin Side Channel (C.2)
At the Stara Drava Varaždin (C.2) site, works continue on the restoration of the side channel, which was designed and developed as part of the DRAVA LIFE – Integrated River Management project. Vegetation and tree clearing along the route of the future channel, as well as on the area designated for depositing excavated sediment, has […]
